SAP ABAP Message Class U7 Message Number 015 (Activity day &1: unnecessary meter reading results (&2) (vs. billed/slg))
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20_JBP (Package) IS-U: Japanese Billing Preriod

⤷

⤷

Attribute
Message class | ![]() |
U7 | |
Short Description | ![]() |
Japan-Specific Developments | |
Message Number | ![]() |
015 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Activity day &1: unnecessary meter reading results (&2) (vs. billed/slg)
Help Document
Diagnosis
You want to enter a meter reading on activity day .
There are at least unnecessary meter readings on this day, which disrupt the conflict resolution. The conflict is caused by the meter reading reason category that triggers billing, or move-in/installation (meter reading reason ).
Note for error analysis:
Meter reading document number already exists.
System Response
Procedure
- Simplify this meter reading scenario by deleting unnecessary meter readings.
- There should not be any unnecessary meter readings for this day.
- Only meter readings that trigger blling or technical meter readings are important. For example, periodic meter readings or changes to the installation structure. Move-in is also important.
Procedure for System Administration
History
Last changed on/by | ![]() |
20050224 | SAP |
SAP Release Created in | 471 |