SAP ABAP Message Class U7 Message Number 011 (Activity day &1: Unnecessary Meter Reading Results (&2) (vs technology))
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20_JBP (Package) IS-U: Japanese Billing Preriod
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20_JBP (Package) IS-U: Japanese Billing Preriod
Attribute
Message class | U7 | ||
Short Description | Japan-Specific Developments | ||
Message Number | 011 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050224 |
Message Text
Activity day &1: Unnecessary Meter Reading Results (&2) (vs technology)
Help Document
Diagnosis
You want to enter a meter reading on activity day .
However, there are at least unnecessary meter readings for this day , which disrupt the conflict resolution. The conflict is caused by a technical meter reading reason (meter reading reason ).
Note for error analysis:
Meter reading document number already exists for this.
System Response
Procedure
- Simplify this scenario of meter readings by deleting unnecessary meter readings.
- No unneccessary meter readings should exist for this day.
- Only technical meter readings and meter readings that trigger billing are important. For example, periodic meter readings or changes to the installation structure. Move-in is also important.
Procedure for System Administration
History
Last changed on/by | 20050224 | SAP | |
SAP Release Created in | 471 |