SAP ABAP Message Class U7 Message Number 010 (Activity day &1: Conflict with too many meter reading results (&2))
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20_JBP (Package) IS-U: Japanese Billing Preriod

⤷

⤷

Attribute
Message class | ![]() |
U7 | |
Short Description | ![]() |
Japan-Specific Developments | |
Message Number | ![]() |
010 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Activity day &1: Conflict with too many meter reading results (&2)
Help Document
Diagnosis
You want to enter a meter reading on activity day . This would mean that meter readings are entered on the same day, with at least one of them of a technical nature (meter reading reason ).
Note for error analysis:
Meter reading document number already exists for this case.
System Response
Procedure
Simplify this scenario of meter readings by deleting the ones you do not need.
Only five meter readings can exist for this day.
Meter readings that trigger billing or that are technical are important. For example, periodic meter readings or changes to the installation structure. Move-in is also important.
Procedure for System Administration
History
Last changed on/by | ![]() |
20050224 | SAP |
SAP Release Created in | 471 |