SAP ABAP Message Class U7 Message Number 009 (Change billing period &1 <> &2 (meter readings &3 &4))
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20_JBP (Package) IS-U: Japanese Billing Preriod
⤷
⤷
Attribute
| Message class | U7 | ||
| Short Description | Japan-Specific Developments | ||
| Message Number | |
009 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20050224 |
Message Text
Change billing period &1 <> &2 (meter readings &3 &4)
Help Document
Diagnosis
Meter reading documents and have the different BillPer indicators and .
These documents were entered on the same day. As a result, they cannot be consistently processed.
A possible cause of this is an impermissible change in the Customizing settings of SBP/JBP.
Note:
The system expects meter reading results that come from one register on the same day to be entered with the same category.
System Response
Procedure
Procedure for System Administration
History
| Last changed on/by | 20050224 | SAP | |
| SAP Release Created in | 471 |