SAP ABAP Message Class U6 Message Number 059 (Planned billing date &1 in document &2 is inconsistent)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20_BRE (Package) IS-U Processing of Backlogs in Billing
Attribute
Message class U6  
Short Description Message Class for BRE    
Message Number 059  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
Planned billing date &1 in document &2 is inconsistent
Help Document

Diagnosis

You are processing an entry in the error extract table (INSTSET) for installation . This entry contains the document . The scheduled billing date () of this document is not the same as the scheduled billing date () for this entry.

System Response

Procedure

Check if this entry still has to be processed. To do this, call the BRE for installation . This updates the entries for installation in the error extract table.

Procedure for System Administration

History
Last changed on/by 20050224  SAP 
SAP Release Created in   464