SAP ABAP Message Class REAJBD Message Number 008 (The type of the higher-level measure is not suitable)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷
RE-FX-AJ (Application Component) Rent Adjustment
⤷
RE_AJ_BD (Package) RE: Adjustment Master Data
⤷
⤷
Attribute
| Message class | REAJBD | ||
| Short Description | Messages for Adjustment Basic Data | ||
| Message Number | |
008 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20130531 |
Message Text
The type of the higher-level measure is not suitable
Help Document
Diagnosis
Adjustment measures that are not part of a cost efficiency analysis have to have the same measure type as their higher-level adjustment measure.
Note the following restrictions:
- You are not allowed to assign higher-level measures to a main cost efficiency analysis.
- A partial cost efficiency analysis is only allowed to have a main cost efficiency analysis as its higher-level measure.
- An additional cost efficiency analysis is only allowed to have a partial cost efficiency analysis as its higher-level measure.
System Response
Procedure
Procedure for System Administration
History
| Last changed on/by | 20131127 | SAP | |
| SAP Release Created in | 500 |