SAP ABAP Message Class PPH_MRP Message Number 185 (No valid BOM status (T415S-KZAMS))
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP (Application Component) Material Requirements Planning
     PPH_MRP (Package) PP on HANA: MRP package
Attribute
Message class PPH_MRP  
Short Description    
Message Number 185  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20131127   
Message Text
No valid BOM status (T415S-KZAMS)
Help Document

Diagnosis

The status of the BOM determined by MRP Live in HANA is not valid.

System Response

The system plans the material in classic MRP.

Procedure

To avoid this situation in future where the material is planned twice, you should check the BOM status.

Procedure for System Administration

History
Last changed on/by 20131127  SAP 
SAP Release Created in   616