SAP ABAP Message Class PPH_MRP Message Number 183 (No valid BOM for top-level material)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP (Application Component) Material Requirements Planning
     PPH_MRP (Package) PP on HANA: MRP package
Attribute
Message class PPH_MRP  
Short Description    
Message Number 183  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20131127   
Message Text
No valid BOM for top-level material
Help Document

Diagnosis

MRP Live in HANA could not find a valid BOM for the required quantity and date of the top-level material.

System Response

The system plans the material in MRP Live on HANA and issues an appropriate warning.

Procedure

You should check the BOM or the procurement type.

Procedure for System Administration

History
Last changed on/by 20131127  SAP 
SAP Release Created in   616