SAP ABAP Message Class PPERES Message Number 014 (Unit of measure adjusted to the base unit of measure for the material)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPERES (Package) RES-Specific iPPE Objects
Attribute
Message class PPERES  
Short Description Messages for Resource Nodes    
Message Number 014  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20040316   
Message Text
Unit of measure adjusted to the base unit of measure for the material
Help Document

Diagnosis

When a material is maintained for a production resource, the unit of measure for the production resource is automatically adjusted to agree with the base unit of measure in the material master. This adjustment makes subsequent processes possible, such as procuring operating facilities.

System Response

Procedure

Procedure for System Administration

History
Last changed on/by 20040316  SAP 
SAP Release Created in   46C1