SAP ABAP Message Class PPERES Message Number 014 (Unit of measure adjusted to the base unit of measure for the material)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPERES (Package) RES-Specific iPPE Objects
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPERES (Package) RES-Specific iPPE Objects
Attribute
Message class | PPERES | ||
Short Description | Messages for Resource Nodes | ||
Message Number | 014 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Unit of measure adjusted to the base unit of measure for the material
Help Document
Diagnosis
When a material is maintained for a production resource, the unit of measure for the production resource is automatically adjusted to agree with the base unit of measure in the material master. This adjustment makes subsequent processes possible, such as procuring operating facilities.
System Response
Procedure
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C1 |