SAP ABAP Message Class PPEFLO Message Number 419 (No valid line balance relationship exists for line structure &1)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEFLO (Package) iPPE - Factory Layout Share
Attribute
Message class PPEFLO  
Short Description Messages for iPPE Application Object FLO    
Message Number 419  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20081217   
Message Text
No valid line balance relationship exists for line structure &1
Help Document

Diagnosis

In the explosion of a process structure and a line structure, it was determined that no line balancing relationships were maintained. The information regarding which activity is to be carried out on which station of a line was not specified.

System Response

The Rapid Planning Matrix cannot build an activity matrix, since no valid line balancing relationships exist.

Procedure

Maintain the missing line balancing relationships.

If the error occurs during PDS generation, check whether the application log contains the warning "Production version &1 &2 does not have any components of the product structure" (Message no. PPECHK130).
In this case the error is output because there are no valid component variants. That means that no activities are valid and thus no line balancing relationships are valid (no valid line balancing relationships exist).

Procedure for System Administration

History
Last changed on/by 20081217  SAP 
SAP Release Created in   46C2