SAP ABAP Message Class PPEFLO Message Number 417 (Asssignment of &1 &2 to part of the line network &3 missing)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEFLO (Package) iPPE - Factory Layout Share
Attribute
Message class PPEFLO  
Short Description Messages for iPPE Application Object FLO    
Message Number 417  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20041209   
Message Text
Asssignment of &1 &2 to part of the line network &3 missing
Help Document

Diagnosis

When exploding the line structure for the rapid planning matrix, the system determined that &1 &2 is part of the exploded line structure but there is no assignment to a part of the line network &3.

System Response

The system explodes the line structures of the configurable material and its material variants that are displayed in a rapid planning matrix together. When fixing components in the planned order, incorrect goods movements can occur in the confirmation as the assignment of the relevant reporting point to a component during the explosion may possibly be incorrect.

Procedure

Use different rapid planning matrices for the configurable material and for the material variants whose line structures differ in the resulting order activities in which separate line networks are modeled.

Procedure for System Administration

History
Last changed on/by 20081217  SAP 
SAP Release Created in   46C2