SAP ABAP Message Class PPEFLO Message Number 410 (&1 is not assigned to alternative line &2 (&3) (Assignment created))
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEFLO (Package) iPPE - Factory Layout Share
Attribute
Message class PPEFLO  
Short Description Messages for iPPE Application Object FLO    
Message Number 410  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20040316   
Message Text
&1 is not assigned to alternative line &2 (&3) (Assignment created)
Help Document

Diagnosis

A line structure contains lines that are alternative to one another. The system found line balance relationships to alternative line structures for the activity . However, the activity is not assigned to all alternative lines. The system has found no line balance relationships for activity to alternative line in the group of alternative lines .

System Response

The system generates a default assignment of the activity to the alternative lines for the missing assignment. The system can now create requirements in the Rapid Planning Matrix for the components that are assigned to this activity. Even if the order runs through one of the alternative lines for which no line balance relationship exists.

Procedure

If you have forgotten the missing line balance relationship, you can create it afterwards.

Procedure for System Administration

History
Last changed on/by 20081217  SAP 
SAP Release Created in   46C2