SAP ABAP Message Class PPEFLO Message Number 406 (Standard path indicator not clear for &1 &2. Alternative &3 selected)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷
AP-PPE (Application Component) Integrated Product and Process Engineering
⤷
CPPEFLO (Package) iPPE - Factory Layout Share

⤷

⤷

Attribute
Message class | ![]() |
PPEFLO | |
Short Description | ![]() |
Messages for iPPE Application Object FLO | |
Message Number | ![]() |
406 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20040316 |
Message Text
Standard path indicator not clear for &1 &2. Alternative &3 selected
Help Document
Diagnosis
is a multiple work center. In the case of multiple work centers, exactly one of the alternative work centers must be selected as the standard path along the production line. This standard path is relevant for planning.
For , more than one of the alternatives has been selected as the standard path. This means that a unique selection cannot be made, which is necessary for planning.
System Response
The system has selected the alternative as the standard path. This selection was made on the basis of the way all the alternatives of that have been selected as the standard path are sorted.
Procedure
Indicate which alternative of is the unique and correct standard alternative.
Procedure for System Administration
History
Last changed on/by | ![]() |
20081217 | SAP |
SAP Release Created in | 46C2 |