SAP ABAP Message Class PPECHK Message Number 406 (Activity &1 is not assigned to alternative line &2 between &3 and &4)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPECHK (Package) Consistency Check of Production Version
Attribute
Message class PPECHK  
Short Description iPPE Consistency Check    
Message Number 406  
Documentation status   3   The short text describes the object sufficiently
Authorization check Error Message      
Changed On 20040316   
Message Text
Activity &1 is not assigned to alternative line &2 between &3 and &4
Help Document

Diagnosis

A line structure contains alternative lines. The system has found line balance relationships to alternative line structures for the activity . However, the activity is not assigned to all alternative lines. The system has not found any line balance relationships to alternative line for the activity .

System Response

For the missing assignment, the system generates a default assignment for the activity to the alternative line. The system can then generate requirements in the Rapid Planning Matrix for the components that are assigned to this activity even if the order uses one of the alternative lines that has no line balance relationship.

If the order does not use one of the alternative lines for which a line balance relationship exist, the activity is not included in activity confirmation or the activity matrix in the Rapid Planning Matrix. Only those activities for which an active line balance exists are considered.

Procedure

Create the missing line balance relationship.

Procedure for System Administration

History
Last changed on/by 20110810  SAP 
SAP Release Created in   200