SAP ABAP Message Class PPECHK Message Number 203 (&1 &2 has not been assigned to an activity)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPECHK (Package) Consistency Check of Production Version
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPECHK (Package) Consistency Check of Production Version
Attribute
Message class | PPECHK | ||
Short Description | iPPE Consistency Check | ||
Message Number | 203 | ||
Documentation status | 3 | The short text describes the object sufficiently | |
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
&1 &2 has not been assigned to an activity
Help Document
Diagnosis
Components that are not assigned to a routing activity are automatically assigned to the first production activity or the first line activity.
System Response
Procedure
Check if the missing assignment of is included.
Procedure for System Administration
History
Last changed on/by | 20110810 | SAP | |
SAP Release Created in | 200 |