SAP ABAP Message Class PPECHK Message Number 202 (&1 &2 has already been assigned to the activities &3 and &4)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPECHK (Package) Consistency Check of Production Version
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPECHK (Package) Consistency Check of Production Version
Attribute
Message class | PPECHK | ||
Short Description | iPPE Consistency Check | ||
Message Number | 202 | ||
Documentation status | 3 | The short text describes the object sufficiently | |
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
&1 &2 has already been assigned to the activities &3 and &4
Help Document
Diagnosis
Components cannot be assigned to multiple activities of a routing at the same time because different requirements for the same component can result.
System Response
Procedure
Remove the multiple assignments of components in the routing.
Procedure for System Administration
History
Last changed on/by | 20110810 | SAP | |
SAP Release Created in | 200 |