SAP ABAP Message Class PPEBAL Message Number 005 (The planning resource cannot be assigned to line objects)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEBAL (Package) BAL-Specific iPPE Objects
Attribute
Message class PPEBAL  
Short Description Line Balance Message    
Message Number 005  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20040316   
Message Text
The planning resource cannot be assigned to line objects
Help Document

Diagnosis

You have tried assigning a planning resource to a line object. This assignment is not allowed. A planning resource can only be used for capacity planning and scheduling in shop-floor-oriented manufacturing with iPPE.

System Response

Procedure

If you want to define the available capacity for a line object, assign the type 'Workers' or 'Operating Facilities' to the resources.

Procedure for System Administration

History
Last changed on/by 20040316  SAP 
SAP Release Created in   46C1