SAP ABAP Message Class PPEBAL Message Number 005 (The planning resource cannot be assigned to line objects)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷
AP-PPE (Application Component) Integrated Product and Process Engineering
⤷
CPPEBAL (Package) BAL-Specific iPPE Objects
⤷
⤷
Attribute
| Message class | PPEBAL | ||
| Short Description | Line Balance Message | ||
| Message Number | |
005 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20040316 |
Message Text
The planning resource cannot be assigned to line objects
Help Document
Diagnosis
You have tried assigning a planning resource to a line object. This assignment is not allowed. A planning resource can only be used for capacity planning and scheduling in shop-floor-oriented manufacturing with iPPE.
System Response
Procedure
If you want to define the available capacity for a line object, assign the type 'Workers' or 'Operating Facilities' to the resources.
Procedure for System Administration
History
| Last changed on/by | 20040316 | SAP | |
| SAP Release Created in | 46C1 |