SAP ABAP Message Class PPEACT Message Number 813 (Relationships between activities at &1 &2 are interrupted &3 times)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 813 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Relationships between activities at &1 &2 are interrupted &3 times
Help Document
Diagnosis
The relationships in are incomplete. This leads to inconsistent sequences of the individual activities. Planning in APO is not possible.
System Response
Procedure
Complete the missing relationships.
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |