SAP ABAP Message Class PPEACT Message Number 751 (Time analysis control could not be linked)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class PPEACT  
Short Description Messages for iPPE ACT Application (Activities)    
Message Number 751  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20040316   
Message Text
Time analysis control could not be linked
Help Document

Diagnosis

The time analysis control could not be linked to the interface.

System Response

Procedure

Check whether the time analysis product has been correctly installed. Also check the settings in Customizing under Customizing PPE: Partner Products Time Analysis.

Procedure for System Administration

History
Last changed on/by 20040316  SAP 
SAP Release Created in   46C2