SAP ABAP Message Class PPEACT Message Number 751 (Time analysis control could not be linked)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 751 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Time analysis control could not be linked
Help Document
Diagnosis
The time analysis control could not be linked to the interface.
System Response
Procedure
Check whether the time analysis product has been correctly installed. Also check the settings in Customizing under Customizing PPE: Partner Products Time Analysis.
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |