SAP ABAP Message Class PPEACT Message Number 704 (Inconsistency in resource linkage between &1 and &2 at resource &3)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 704 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Inconsistency in resource linkage between &1 and &2 at resource &3
Help Document
Diagnosis
To create a mode linkage using a primary resource, the activity modes must have the same primary resources. This is required for the entire routing validity period. However, this is not the case for all change statuses of the modes.
System Response
Procedure
Ensure that all modes for both activities use the same primary resources in the entire routing validity period.