SAP ABAP Message Class PPEACT Message Number 625 (The assigned activity &1 does not belong to the routing of assignmnt list)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 625 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
The assigned activity &1 does not belong to the routing of assignmnt list
Help Document
Diagnosis
The activity that you have just assigned does not belong to the routing that was selected in the assignment list.
System Response
Procedure
Delete the assignment.
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |