SAP ABAP Message Class PPEACT Message Number 545 (Resource &1 is already defined as a secondary resource/reqmnt at &2 &3)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 545 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Resource &1 is already defined as a secondary resource/reqmnt at &2 &3
Help Document
Diagnosis
You have tried to specify a resource that is relevant for scheduling, which has already been assigned to the mode as capacity requirements.
System Response
Procedure
Delete the capacity requirements or the secondary resource.
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |