SAP ABAP Message Class PPEACT Message Number 545 (Resource &1 is already defined as a secondary resource/reqmnt at &2 &3)
Hierarchy
EA-IPPE (Software Component) SAP iPPE
   AP-PPE (Application Component) Integrated Product and Process Engineering
     CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class PPEACT  
Short Description Messages for iPPE ACT Application (Activities)    
Message Number 545  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20040316   
Message Text
Resource &1 is already defined as a secondary resource/reqmnt at &2 &3
Help Document

Diagnosis

You have tried to specify a resource that is relevant for scheduling, which has already been assigned to the mode as capacity requirements.

System Response

Procedure

Delete the capacity requirements or the secondary resource.

Procedure for System Administration

History
Last changed on/by 20040316  SAP 
SAP Release Created in   46C2