SAP ABAP Message Class PPEACT Message Number 508 (Resource &1 at &2 &3 is not set for capacity planning)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 508 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Resource &1 at &2 &3 is not set for capacity planning
Help Document
Diagnosis
You cannot assign the resource to the mode as a primary resource because you have not set the indicator for capacity planning. Only resources for which capacity planning is allowed can be used as primary resources.
System Response
Procedure
Double click on the resource and set the indicator Capacity Planning in resource maintenance.
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |