SAP ABAP Message Class PPEACT Message Number 109 (No capacity requirements maintained at &1 &2 for resource &3)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 109 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
No capacity requirements maintained at &1 &2 for resource &3
Help Document
Diagnosis
For resource to be included in planning in SAP APO, you must enter capacity requirements. However, no capacity requirements have been specified at for the resource.
System Response
Procedure
Maintain the capacity requirements with the relevant unit of measure for the resource at .
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |