SAP ABAP Message Class PPEACT Message Number 108 (Scheduling data is incomplete for &1 &2)
Hierarchy
☛
EA-IPPE (Software Component) SAP iPPE
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
⤷ AP-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEACT0C (Package) Customizing for iPPE Process Structure
Attribute
Message class | PPEACT | ||
Short Description | Messages for iPPE ACT Application (Activities) | ||
Message Number | 108 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20040316 |
Message Text
Scheduling data is incomplete for &1 &2
Help Document
Diagnosis
For an activity to be considered for planning in SAP APO, at least one standard time must be maintained at the activity mode.
System Response
Procedure
Enter at least one standard time (with corresponding unit) at .
Procedure for System Administration
History
Last changed on/by | 20040316 | SAP | |
SAP Release Created in | 46C2 |