SAP ABAP Message Class MLCCS Message Number 042 (Split for preliminary valuation in currency &2 not found)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-ACT (Application Component) Actual Costing/Material Ledger
     CKMLCCS (Package) Actual Cost Component Split
Attribute
Message class MLCCS  
Short Description Message for Actual Costing    
Message Number 042  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20110908   
Message Text
Split for preliminary valuation in currency &2 not found
Help Document

Diagnosis

The actual cost component split for the material is managed in plant . The system was unable to find the cost component split for the preliminary valuation in currency .

System Response

In order not to prevent further processing (release of standard cost estimate, release of future valuation price or price change) the material ledger continues to use cost component split at the old standard price for the preliminary valuation. However, this can lead to an incorrect cost component split for this period.

This problem does not have any influence on the release of a standard cost estimate.

Procedure

Contact your system administrator so that in consultation with SAP Support you can deal with the inconsistent status as quickly as possible.

History
Last changed on/by 20131127  SAP 
SAP Release Created in