SAP ABAP Message Class MLCCS Message Number 040 (Preliminary valuation with rescaled split in currency &2)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-ACT (Application Component) Actual Costing/Material Ledger
⤷
CKMLCCS (Package) Actual Cost Component Split

⤷

⤷

Attribute
Message class | ![]() |
MLCCS | |
Short Description | ![]() |
Message for Actual Costing | |
Message Number | ![]() |
040 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20110908 |
Message Text
Preliminary valuation with rescaled split in currency &2
Help Document
Diagnosis
The actual cost component split is managed in plant for the material. The system was unable to tranfer the cost component split to be released for currency to the material ledger.
System Response
In order not to prevent further processing, the material ledger continues to use the cost component split at the old standard price for the preliminary valuation. The cost component split is subsequently rescaled to the new standard price, meaning the percentage distribution to the individual cost components remains unchanged.
This should not normally lead to any problems as the material ledger can still calculate the correct actual cost component split at the period end.
This problem does not influence the release of a standard cost estimate.
Procedure
Procedure for System Administration
History
Last changed on/by | ![]() |
20131127 | SAP |
SAP Release Created in |