SAP ABAP Message Class MLCCS Message Number 010 (Cost element &1 is not assigned to a cost component in CostCompStruct &2)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-ACT (Application Component) Actual Costing/Material Ledger
⤷
CKMLCCS (Package) Actual Cost Component Split

⤷

⤷

Attribute
Message class | ![]() |
MLCCS | |
Short Description | ![]() |
Message for Actual Costing | |
Message Number | ![]() |
010 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20110908 |
Message Text
Cost element &1 is not assigned to a cost component in CostCompStruct &2
Help Document
Diagnosis
You have activated the actual cost component split.
No cost component has been assigned to cost element origin group in cost component structure for chart of accounts . The system is unable to assign the value to a cost component.
System Response
You cannot carry out posting.
Procedure
Check whether for this operation the value to be posted is to be assigned to this cost element.
If the value has been assigned to the wrong cost element, you should change the account assignment for this operation.
If the value has been assigned to the right cost element, then maintain an assignment of the cost element and origin group in Customizing of Product Cost Planning.
Procedure for System Administration
History
Last changed on/by | ![]() |
20131127 | SAP |
SAP Release Created in |