SAP ABAP Message Class MILL_PC_OB Message Number 028 (Original batch purity rule (rule &1) breached --> New batch determination)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-MP-PP (Application Component) Production Planning and Control (PP) enhancements
⤷ MILL_PP (Package) IS: Mill Products - Production Planning and Control
⤷ IS-MP-PP (Application Component) Production Planning and Control (PP) enhancements
⤷ MILL_PP (Package) IS: Mill Products - Production Planning and Control
Attribute
Message class | MILL_PC_OB | ||
Short Description | Original Batch | ||
Message Number | 028 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050301 |
Message Text
Original batch purity rule (rule &1) breached --> New batch determination
Help Document
Diagnosis
You entered a batch that is not assigned to the relevant original batch.
System Response
The system generates the following error messages:
- Original batch purity (rule 1) breached -> new batch determination Batches that come from different original batches are assigned to a component.
- Original batch purity (rule 2) breached -> new batch determination The production order contains further components the batches of which come from another original batch.
Procedure
A check on original batch purity is required for the material. Delete the entered batch and start batch determination in order to select the relevant original batch from the batches proposed by the system.
History
Last changed on/by | 20050301 | SAP | |
SAP Release Created in | 46C1 |