SAP ABAP Message Class DV Message Number 552 (Inconsistency between current date and date of last report export)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ EHS-SAF (Application Component) Product Safety
⤷ CVDD (Package) EH&S: Report Shipping
⤷ EHS-SAF (Application Component) Product Safety
⤷ CVDD (Package) EH&S: Report Shipping
Attribute
Message class | DV | ||
Short Description | EHS: Messages for Report Shipping | ||
Message Number | 552 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Inconsistency between current date and date of last report export
Help Document
Diagnosis
An inconsistency occurred between the current date and the date of the last report export:
- Current date:
- Last export:
The following scenarios may occur:
- If the last export date is the same as the current date, the report export will have been carried out by the current date.
- If the last export date is in the future, the environment parameter RE_LAST_EXPORT that contains the date of the last report export is filled manually with an invalid value.
System Response
Report export was not carried out.
Procedure
In Customizing, check the environment parameter RE_LAST_EXPORT.
History
Last changed on/by | 20130531 | SAP | |
SAP Release Created in |