SAP ABAP Message Class DV Message Number 552 (Inconsistency between current date and date of last report export)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   EHS-SAF (Application Component) Product Safety
     CVDD (Package) EH&S: Report Shipping
Attribute
Message class DV  
Short Description EHS: Messages for Report Shipping    
Message Number 552  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Inconsistency between current date and date of last report export
Help Document

Diagnosis

An inconsistency occurred between the current date and the date of the last report export:

  • Current date:
  • Last export:

The following scenarios may occur:

  • If the last export date is the same as the current date, the report export will have been carried out by the current date.
  • If the last export date is in the future, the environment parameter RE_LAST_EXPORT that contains the date of the last report export is filled manually with an invalid value.

System Response

Report export was not carried out.

Procedure

In Customizing, check the environment parameter RE_LAST_EXPORT.

History
Last changed on/by 20130531  SAP 
SAP Release Created in