Hierarchy
⤷ CA-EUR (Application Component) European Monetary Union: Euro
⤷ CNV_MBT_MAIN_46 (Package) MBT PCL Main objects from Release 4.6 on
Attribute
Message class | CNVMBTRFC | ||
Short Description | Messages used in RFC Management and its objects | ||
Message Number | 026 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20141030 |
Message Text
Help Document
Diagnosis
Cause of the error
The synchronization check finds out that there is a conflict with another control system. The error message give the information which subproject and destination is affected. In the detaild status you also get the information which destination is affected.
The check found out that in the system/client where we wanted to synchronize the destinations already another control system is using the same subproject name with an active package. You can check this by going into the affected system/client and calling transaction SE11 or any other transaction for showing the table entries. Enter the table name cnvmbtpack and press button 'Display'. Press button 'Contents' in the application toolbar. Enter the affectd subproject name into field subproject. Press button 'Execute' or key F8. You will see the active package of the subproject. If there are two active packages or a package with system/client data that is different from the affected control system then we have a conflict.
Solving the conflict
Option 1.
The conflict can be solved by creating a new subproject in the control system where the conflict is shown. The other control system is not affected because the synchronization from the affected control system aborted and no destination data were overwritten.
Option 2.
In the control system where the error occurs you can change the destination ids. This can be done by pressing button 'SEARCH' in the registry 'Definition'. Before this you should create the destinations you need in the transaction SM59. With the search function you can search for your created destination. Select your destination in the table with the results and press button 'Use'. The destination id of the execution target you have selected will be replaced by your destination id. Do this also with the all destinations used for the affected system. If all destination ids are replaced do the synchronization. After this the synchronization status will be changed to green.
System Response
Procedure
Procedure for System Administration
History
Last changed on/by | 20141030 | SAP | |
SAP Release Created in | 2006_1_46C |