SAP ABAP Message Class CNV_20100 Message Number 227 (&1 (G/L acct) and &2 (primary cost element in CoAr &4 into account &3)
Hierarchy
DMIS (Software Component) DMIS 2011_1
   CA-GTF-BS (Application Component) Business Application Support
     CNV_20100 (Package) CNCC: Chart of accounts conversion
Attribute
Message class CNV_20100  
Short Description Messageclass for chart of account conversion    
Message Number 227  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141030   
Message Text
&1 (G/L acct) and &2 (primary cost element in CoAr &4 into account &3
Help Document

Diagnosis

The system found that the account is meant to be merged with the primary cost element into . is defined as a G/L account, but not a cost element in controlling area , whereas is defined as a G/L account as well as a cost element in controlling area . (From a technical perspective, this means that has a record in the table SKB1, but not in the table CSKB, wheras has both.)

After the conversion, target account would be a primary cost element. In this case, the system would assume that all FI postings were transferred to CO accordingly. However this is not true for , which would mean that financials and controlling data would be inconsistent after the conversion.

System Response

Error

From a technical perspective, this message can be ignored.

This may make sense in the following cases:

  • No postings to the respective accounts/cost elements have been made.
  • The respective accounts and cost elements are not used any longer and are meant to be merged into a dummy account.

Procedure

Analyze the situation and either change the mapping table so that G/L accounts are not merged with primary cost elements, or decide to ignore the message because one of the prerequisites described above applies.

History
Last changed on/by 20141030  SAP 
SAP Release Created in