SAP ABAP Message Class CNV_20100 Message Number 196 (No priority indicator set at B level for cost element &1 &2 in CoAr &3)
Hierarchy
DMIS (Software Component) DMIS 2011_1
   CA-GTF-BS (Application Component) Business Application Support
     CNV_20100 (Package) CNCC: Chart of accounts conversion
Attribute
Message class CNV_20100  
Short Description Messageclass for chart of account conversion    
Message Number 196  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20141030   
Message Text
No priority indicator set at B level for cost element &1 &2 in CoAr &3
Help Document

Diagnosis

The system found that no priority indicator is set for the B segment merge for cost element (that will exist after the conversion) in controlling area .

This means that it is not clear which settings from which controlling area will take priority in the merge.

System Response

Procedure

Either set the priority indicator in the mapping table for B segment merges for the respective cost element, or check the settings for the new cost element manually after the conversion.

History
Last changed on/by 20141030  SAP 
SAP Release Created in