SAP ABAP Message Class CJ Message Number 009 (Start date must be later than "&")
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-ST-OPR (Application Component) Operative Structures
⤷
CN_PSP_OPR (Package) Operative Work Breakdown Structure
⤷
⤷
Attribute
| Message class | CJ | ||
| Short Description | Project master data and structure | ||
| Message Number | |
009 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20130531 |
Message Text
Start date must be later than "&"
Help Document
Diagnosis
You have entered a date that is not within the scheduling horizon.
System Response
Procedure
Check the start date.
History
| Last changed on/by | 20130531 | SAP | |
| SAP Release Created in |