SAP ABAP Message Class CFV Message Number 079 (Consistency check for BOM is not possible; incomplete data)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-PI-MD (Application Component) Basic Data
⤷ CPFX (Package) Production version
⤷ PP-PI-MD (Application Component) Basic Data
⤷ CPFX (Package) Production version
Attribute
Message class | CFV | ||
Short Description | Message Class for Production Versions | ||
Message Number | 079 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20020125 |
Message Text
Consistency check for BOM is not possible; incomplete data
Help Document
Diagnosis
You want to carry out a consistency check for the production versions. However, data about the bill of material (BOM) is missing.
System Response
The system cannot clearly identify the BOM. It does not perform the consistency check.
Procedure
- Maintain the task list type, task list group, and group counter for the BOM.
- Repeat the consistency check.
Procedure for System Administration
History
Last changed on/by | 19990208 | SAP | |
SAP Release Created in |