SAP ABAP Message Class CFV Message Number 054 (Valid-from date is set to current date and valid-to is set to maximum)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-PI-MD (Application Component) Basic Data
⤷ CPFX (Package) Production version
⤷ PP-PI-MD (Application Component) Basic Data
⤷ CPFX (Package) Production version
Attribute
Message class | CFV | ||
Short Description | Message Class for Production Versions | ||
Message Number | 054 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20020115 |
Message Text
Valid-from date is set to current date and valid-to is set to maximum
Help Document
Diagnosis
You have not entered data for the validity period of the production version.
System Response
The system sets the values for the start and end dates of the validity period automatically:
- The current date (24.October.2015) is taken as the start of the validity period.
- The maximum system date (12/31/9999) is assigned as the end of the validity period.
Procedure
If required, change the start and end date of the production version's validity period.
Procedure for System Administration
History
Last changed on/by | 19990208 | SAP | |
SAP Release Created in |