SAP ABAP Message Class CC Message Number 565 (Change object & has already been used in ECR &)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Attribute
Message class | CC | ||
Short Description | ECM: Messages | ||
Message Number | 565 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20110908 |
Message Text
Change object & has already been used in ECR &
Help Document
Diagnosis
You want to create a new change object (for example, BOM) for the change request.
System Response
The system checks whether
- the indicator One object management record for ECR/ECO is set in the control data in Customizing for Engineering Change Management:
- the change object has already been processed with reference to an ECO that has not been completed
Procedure
Since the indicator is set and the change object has already been processed with reference to an incomplete order, you cannot enter the change object.
You cannot create an object management record for the change object until you have set the system status Complete in the ECO.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |