SAP ABAP Message Class CC Message Number 163 (Date & is within a protected time period)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-ECM (Application Component) Engineering Change Management
     CC (Package) Engineering Change Management
Attribute
Message class CC  
Short Description ECM: Messages    
Message Number 163  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Date & is within a protected time period
Help Document

Diagnosis

You see this message in one of the following processing situations:

  • You are processing a change master record:
    • Entering the valid-from date
    • Entering an alternative date
    • Date shift of valid-from date or alternative date
    • Assigning alternative date to change object or deleting an allocation
  • You are processing a change object with reference to a change number whose valid-from date is in the protected time period:
    • Changing a change object (for example, BOM or routing)
    • Assigning or changing a revision level

System Response

The system checks the control data for data shifts in Customizing for engineering change management. In your company, a protected time period is defined.
In the fields Warn. time in days and/or Error time in days, a number of calendar days defines how the protected time period is calculated.

Procedure

If the message is:

  • A warning message, processing is allowed. However, we advise you to check the change objects. If you confirm the warning message, you can continue processing.
  • An error message, processing is not allowed.

History
Last changed on/by 20131127  SAP 
SAP Release Created in