SAP ABAP Message Class CC Message Number 146 (Field & requires length &, but field length is &)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷
CA-GTF-ECM (Application Component) Engineering Change Management
⤷
CC (Package) Engineering Change Management
⤷
⤷
Attribute
| Message class | CC | ||
| Short Description | ECM: Messages | ||
| Message Number | |
146 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
Field & requires length &, but field length is &
Help Document
Diagnosis
You want to do a date shift.
When you do a date shift, the valid-from date for all effectivity periods of all linked objects is re-calculated by the system.
This changes the sequence of effectivity periods on for BOM , item .
System Response
The system checks whether the BOM is still consistent. The BOM is not consistent if, for example, the BOM has already been changed with a change number with the same valid-from date as the new valid-from date you define in your date shift.
Procedure
Since your date shift violates the consistency of the BOM named above, you cannot carry out the date shift.
History
| Last changed on/by | 20131127 | SAP | |
| SAP Release Created in |