SAP ABAP Message Class CC Message Number 146 (Field & requires length &, but field length is &)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Attribute
Message class | CC | ||
Short Description | ECM: Messages | ||
Message Number | 146 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Field & requires length &, but field length is &
Help Document
Diagnosis
You want to do a date shift.
When you do a date shift, the valid-from date for all effectivity periods of all linked objects is re-calculated by the system.
This changes the sequence of effectivity periods on for BOM , item .
System Response
The system checks whether the BOM is still consistent. The BOM is not consistent if, for example, the BOM has already been changed with a change number with the same valid-from date as the new valid-from date you define in your date shift.
Procedure
Since your date shift violates the consistency of the BOM named above, you cannot carry out the date shift.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |