SAP ABAP Message Class CC Message Number 146 (Field & requires length &, but field length is &)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-ECM (Application Component) Engineering Change Management
     CC (Package) Engineering Change Management
Attribute
Message class CC  
Short Description ECM: Messages    
Message Number 146  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Field & requires length &, but field length is &
Help Document

Diagnosis

You want to do a date shift.
When you do a date shift, the valid-from date for all effectivity periods of all linked objects is re-calculated by the system.
This changes the sequence of effectivity periods on for BOM , item .

System Response

The system checks whether the BOM is still consistent. The BOM is not consistent if, for example, the BOM has already been changed with a change number with the same valid-from date as the new valid-from date you define in your date shift.

Procedure

Since your date shift violates the consistency of the BOM named above, you cannot carry out the date shift.

History
Last changed on/by 20131127  SAP 
SAP Release Created in