SAP ABAP Message Class CC Message Number 141 (Change number &: & is inconsistent with existing change status)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Attribute
Message class | CC | ||
Short Description | ECM: Messages | ||
Message Number | 141 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Change number &: & is inconsistent with existing change status
Help Document
Diagnosis
You want to carry out a date shift.
When you carry out a date shift, the system re-defines the valid-from date for each effectivity period of the objects linked to the change master.
This process would change the sequence of effectivity periods of BOM , alternative on .
System Response
The system checks whether the BOM is still consistent after a date shift. This is not the case if, for example, the BOM has already been changed using a change number with the new valid-from date you want to shift to.
Procedure
As the BOM will no longer be consistent if the date shift is carried out, you cannot carry out the date shift.
History
Last changed on/by | 20131127 | SAP | |
SAP Release Created in |