SAP ABAP Message Class AQV Message Number 240 (Assignment of lines to line groups is incorrect or incomplete)
Hierarchy
☛
SAP_BASIS (Software Component) SAP Basis Component
⤷
BC-SRV-QUE (Application Component) SAP Query
⤷
SQUE (Package) Application Development R/3 SAP Query

⤷

⤷

Attribute
Message class | ![]() |
AQV | |
Short Description | ![]() |
Message texts for SAP Query | |
Message Number | ![]() |
240 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20110908 |
Message Text
Assignment of lines to line groups is incorrect or incomplete
Help Document
Diagnosis
You tried to make an incorrect assignment between lines and line groups. There are two possible causes of the error:
1. Lines must be assigned to line groups in increasing order, i.e. the line group must either stay the same or also get larger with increasing line numbers.
2. The assignment is incomplete, i.e. not all the lines were assigned to a line group. You must assign either all the lines of a line group or none at all.
System Response
Procedure
Correct the assignment so that the specified error no longer occurs.
History
Last changed on/by | ![]() |
20140121 | SAP |
SAP Release Created in |