SAP ABAP Message Class WVLB (Messages for Load Building)
Basic Data
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
MM-PUR-PO (Application Component) Purchase Orders
⤷
WVLB (Package) Retail Load Building
⤷
⤷
Attributes
| Message class | WVLB | |
| Short Description | Messages for Load Building | |
| Changed On | 20100310 | |
| Last Changed At | 183310 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | No currency determined for plant &1 | Space: object requires documentation | ||
| 2 | FM &1 called with wrong or missing input parameter values | Space: object requires documentation | ||
| 3 | Error calling function module &1 | Space: object requires documentation | ||
| 4 | General Customizing entry missing for automatic load building | Space: object requires documentation | ||
| 5 | No valid plant data found for plant category &1 specified | Space: object requires documentation | ||
| 6 | No valid vendor data found | Space: object requires documentation | ||
| 7 | No valid LB combination of vendor/plant/purchasing org. found | Space: object requires documentation | ||
| 8 | Restriction profile must be entered in case 1:M (= plant group filled) | Space: object requires documentation | ||
| 9 | Error &1 calling function module &2 | Space: object requires documentation | ||
| 10 | Only released purchase orders are included in the simulation | Space: object requires documentation | ||
| 11 | Plant group &1 not defined | Space: object requires documentation | ||
| 12 | Group &1 entered is not a valid plant group | Space: object requires documentation | ||
| 13 | No plants found for plant group &1 | Space: object requires documentation | ||
| 14 | In case 1:M, all plants must have same factory calendar | Space: object requires documentation | ||
| 15 | Program versions can only be started in the background | Space: object requires documentation | ||
| 16 | Only set one parameter for starting other program versions | Space: object requires documentation | ||
| 17 | Error occurred executing submit | Space: object requires documentation | ||
| 18 | Select a correct value for document generation | Space: object requires documentation | ||
| 19 | Select a valid plant category | Space: object requires documentation | ||
| 20 | Select a valid restriction profile | Space: object requires documentation | ||
| 21 | Multiple loads can only be built in simulation mode with planning cycle | Space: object requires documentation | ||
| 22 | Int. program start and simultaneous parallel processing are not possible | Space: object requires documentation | ||
| 23 | Parallel processing requires the number of vendors for each process | Space: object requires documentation | ||
| 24 | Only maintain the number of vendors per process for parallel processing | Space: object requires documentation | ||
| 25 | Load build profile &1 is not defined | The short text describes the object sufficiently | ||
| 26 | Start of vendor &1 and plant &2 | The short text describes the object sufficiently | ||
| 27 | &1 load building combinations determined | Space: object requires documentation | ||
| 28 | Load building combination processed with components: | Space: object requires documentation | ||
| 29 | (vendor / purchasing org. / VSR no. / plants) | Space: object requires documentation | ||
| 30 | &1 / &2 / &3 / &4 | Space: object requires documentation | ||
| 31 | Load building cancelled due to wrong determination of vendor service lev. | Space: object requires documentation | ||
| 32 | Vendor service level for plant &1 and date &2: &3 | Space: object requires documentation | ||
| 33 | Load building cancelled. Definition of restriction profile &1 not found | Space: object requires documentation | ||
| 34 | No allowed purchase orders found for load | Space: object requires documentation | ||
| 35 | The following allowed POs were found for load: | Space: object requires documentation | ||
| 36 | - doc. no.: &1 ; joint delivery date &2 | Space: object requires documentation | ||
| 37 | No allowed materials exist for load | Space: object requires documentation | ||
| 38 | Load building terminated due to missing purchase orders and materials | Space: object requires documentation | ||
| 39 | No allowed pur. reqs exist for load | Space: object requires documentation | ||
| 40 | The following allowed pur. reqs were found for load: | Space: object requires documentation | ||
| 41 | Load building terminated due to missing requirement element | Space: object requires documentation | ||
| 42 | Build load: vendor service level = 100% | Space: object requires documentation | ||
| 43 | Build load: IB pur. reqs. &1 exist for plant &2 | Space: object requires documentation | ||
| 44 | Build load: promotion PO &1 exists for plant &2 | Space: object requires documentation | ||
| 45 | Build load: target (&1) > actual vendor service level (&2) for plant &3 | Space: object requires documentation | ||
| 46 | Load building cancelled as the required criteria are not met | Space: object requires documentation | ||
| 47 | Load building no longer necessary for the following purchase orders: | Space: object requires documentation | ||
| 48 | Load building using range of coverage algorithm not required | Space: object requires documentation | ||
| 49 | Order date for building load using range of coverage algorithm: &1 | Space: object requires documentation | ||
| 50 | Start of range of coverage algorithm | Space: object requires documentation | ||
| 51 | Load building cancelled due to problems with range of coverage algorithm | Space: object requires documentation | ||
| 52 | Execute range of coverage algorithm for day &1 and PO load &2 | Space: object requires documentation | ||
| 53 | Remove addition of quantity &1 for material &2 in plant &3 | Space: object requires documentation | ||
| 54 | Delivery date = start date of range of coverage algorithm: &1 | Space: object requires documentation | ||
| 55 | Load building cancelled: no listed material exists | Space: object requires documentation | ||
| 56 | Delivery date for POs with actual vendor service level from &1 to &2 | Space: object requires documentation | ||
| 57 | Delivery date fror POs for load building from &1 to &2 | Space: object requires documentation | ||
| 58 | Delivery date for promotion purchase orders in building load frm &1 to &2 | Space: object requires documentation | ||
| 59 | Release date for pur. reqs. in building load from &1 to &2 | Space: object requires documentation | ||
| 60 | Delivery date for pur. reqs in building load from &1 to &2 | Space: object requires documentation | ||
| 61 | Release date for IB pur. reqs in building load from &1 to &2 | Space: object requires documentation | ||
| 62 | Reason for termination of ROC algorithm: all restrictions are met | Space: object requires documentation | ||
| 63 | Reason for termination of ROC alg.: No additional qty in last step! | Space: object requires documentation | ||
| 64 | Reason for termination of ROC alg.:maximum range of coverage (&1) reached | Space: object requires documentation | ||
| 65 | Load building not necessary today | Space: object requires documentation | ||
| 66 | Material &1 cannot be ordered automatically for plant &2 | Space: object requires documentation | ||
| 67 | Current range of coverage in plant &1 for matl &2 (forecast: &4) &3 days | Space: object requires documentation | ||
| 68 | Range of coverage algorithm terminated after &1 day(s) | Space: object requires documentation | ||
| 69 | Current range of coverage date: &1 | Space: object requires documentation | ||
| 70 | Carry out more specific method | Space: object requires documentation | ||
| 71 | Additional quantity determined: &1 | Space: object requires documentation | ||
| 72 | Add quantity of &3 in PO &4 for plant &1 and material &2 | Space: object requires documentation | ||
| 73 | Add quantity of &3 in pur. req. &4 for plant &1 and material &2 | Space: object requires documentation | ||
| 74 | New rounded quantity (rounding value for new unrounded quantity): &1 | Space: object requires documentation | ||
| 75 | Released PO quantities (with delivery date <= &1) for range of coverage: | Space: object requires documentation | ||
| 76 | The following quantities will be included in load building: | Space: object requires documentation | ||
| 77 | Current stock of material &2 in plant &1: &3 (initial value for ROC) | Space: object requires documentation | ||
| 78 | Entries exist in list of results for &1 combinations | Space: object requires documentation | ||
| 79 | The following new quantities are produced for plant &1 and material &2 | Space: object requires documentation | ||
| 80 | New unrounded quantity (sum of all pur. req. and additional qties): &1 | Space: object requires documentation | ||
| 81 | New target range of coverage: &1 | Space: object requires documentation | ||
| 82 | Material not included as a result of shelf-life (maximum &1 days) | Space: object requires documentation | ||
| 83 | Vendor service level for plant &1, date &2: &3 (reason: missing forect) | Space: object requires documentation | ||
| 84 | Qty received (&1) or used (&2) leads to zero quantity | Space: object requires documentation | ||
| 85 | Program finished due to a serious error | Space: object requires documentation | ||
| 86 | Purchase order date = &1;delivery date = &2;act.vendor service level = &3 | Space: object requires documentation | ||
| 87 | Load building carried out (entry in result list) | Space: object requires documentation | ||
| 88 | No load building carried out (no entry in result list) | Space: object requires documentation | ||
| 89 | Processing time &1 with the following database access: | Space: object requires documentation | ||
| 90 | Reading: &1 materials; &2 PO items; &3 purchase requisition items | Space: object requires documentation | ||
| 91 | Writing: &1 PO items; &2 PR items; &3 result list items (WBO2) | Space: object requires documentation | ||
| 92 | Creation of purchase requisition for &1/&2 was terminated: &3 &4 | The short text describes the object sufficiently | ||
| 93 | Vendor: &1 / Purch. org: &2 / VendSR: &3 / Plant: &4 | The short text describes the object sufficiently | ||
| 94 | Automatic Load Building Carried Out Successfully | The short text describes the object sufficiently | ||
| 95 | Load building completed: no relevant material available | The short text describes the object sufficiently |
History
| Last changed on/by | 20100310 | SAP | |
| SAP Release Created in |