SAP ABAP Message Class WT (Retail: Replenishment)
Basic Data
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WRPL (Package) Retail: Replenishment
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WRPL (Package) Retail: Replenishment
Attributes
Message class | WT | |
Short Description | Retail: Replenishment | |
Changed On | 20100310 | |
Last Changed At | 121115 |
Messages
# | Message | Message Short Text | Documentation status | Authorization check |
---|---|---|---|---|
1 | 000 | & | ||
2 | 001 | Please enter either a plant or a customer | ||
3 | 002 | Please enter either a material group or a material | ||
4 | 003 | Please enter either a material group or a material | ||
5 | 004 | All forecast weighting profiles successfully created | ||
6 | 005 | Forecast weighting could not be created | ||
7 | 006 | Replenishment master data missing. Call up material master maintenance | Space: object requires documentation | |
8 | 100 | Replenishment data already exists for the material &1. Choose "Change" | ||
9 | 101 | No reference entries exist for material & | ||
10 | 102 | Replenishment data is being saved | Space: object requires documentation | |
11 | 103 | Last weighting profile reached | ||
12 | 104 | First weighting profile reached | ||
13 | 105 | Forecast weighting factors have already been created | ||
14 | 106 | No replenishment data exists for material &1. Please choose "Create" | ||
15 | 107 | Error occurred transferring requirements groups to customer data | ||
16 | 108 | Errors occurred creating planning objects | ||
17 | 109 | No line was selected | ||
18 | 110 | Replenishment data for customer &1 marked for deletion | ||
19 | 111 | Replenishment data for requirement group &1 marked for deletion | ||
20 | 112 | Replenishment data already created for customer &1 | Space: object requires documentation | |
21 | 113 | Replenishment data already created for requirement group &1 | Space: object requires documentation | |
22 | 114 | Customer data of material &1 blocked by user &2 | ||
23 | 115 | Requirement group data for material &1 blocked by user &2 | ||
24 | 116 | Replenishment data for customer &, material & is blocked by user & | ||
25 | 117 | No historical data exits for combination entered | ||
26 | 118 | No historical data exits for material &1 | ||
27 | 119 | Only &1 instead of &2 sets of historical data exists for material &3 | ||
28 | 120 | Only &1 instead of &2 historical data exists for material group &3 | ||
29 | 121 | Customer &1 does not exist | Space: object requires documentation | |
30 | 122 | Material &1 in plant &2 is blocked by user &3 | Space: object requires documentation | |
31 | 123 | Requirement group &1 does not exist | Space: object requires documentation | |
32 | 124 | Replenishment currently being run for customer &1 by user &2 | Space: object requires documentation | |
33 | 125 | Period of info structure &1 could not be determined | Space: object requires documentation | |
34 | 126 | No target stock determined (target range of coverage <= 0) | Space: object requires documentation | |
35 | 127 | Requirement group &1 already exists | Space: object requires documentation | |
36 | 128 | Enter a requirement group | Space: object requires documentation | |
37 | 129 | Target stock is calculated dynamically. Your entry will be ignored | Space: object requires documentation | |
38 | 130 | Requirements group &1 is still in use and cannot be deleted | Space: object requires documentation | |
39 | 131 | Forecast values for determining target stock do not exist | Space: object requires documentation | |
40 | 132 | The number of selected data records was restricted to &1 | Space: object requires documentation | |
41 | 133 | The checking group does not allow any availability checks | Space: object requires documentation | |
42 | 134 | Store order processing did not return any results | Space: object requires documentation | |
43 | 200 | Replenishment quantities successfully saved | ||
44 | 201 | Replenishment quantities only partially saved. See error list! | Space: object requires documentation | |
45 | 202 | Replenishment data for customer &1 blocked by user &2 | ||
46 | 203 | Replenishment data blocked by user &1 | Space: object requires documentation | |
47 | 204 | No replenishment required for the customers chosen | ||
48 | 205 | Replenishment quantities are already saved | ||
49 | 206 | No replenishment quantities exist for processing | Space: object requires documentation | |
50 | 207 | Problem converting unit of measure &3 for customer &1, material &2 | ||
51 | 208 | Replenishment not defined for material &1 | Space: object requires documentation | |
52 | 209 | Posting period &1 invalid | Space: object requires documentation | |
53 | 210 | Select a replenishment item | Space: object requires documentation | |
54 | 211 | Factor calendar / work calendar &1 invalid | Space: object requires documentation | |
55 | 212 | No factory calendar found for plant &1 | Space: object requires documentation | |
56 | 213 | Replenishment run &1 started | Space: object requires documentation | |
57 | 214 | &1 follow-on documents and &2 messages generated | Space: object requires documentation | |
58 | 215 | No replenishment requirements exist | Space: object requires documentation | |
59 | 216 | Forecast only possible if planning horizon is at least 2 days | Space: object requires documentation | |
60 | 217 | Zero is not allowed. Enter a positive number. | Space: object requires documentation | |
61 | 218 | Replenishment for items &1 to &2 successfully planned | Space: object requires documentation | |
62 | 219 | No unique sales area found for goods recipient &1 | Space: object requires documentation | |
63 | 220 | Error determining customer for goods recipient &1 in sales area &2 &3 &4 | Space: object requires documentation | |
64 | 221 | The planning data was set to date &1 | Space: object requires documentation | |
65 | 250 | Indicates that forecast sales are to be included | Space: object requires documentation | |
66 | 251 | Indicates that the planned receipts/issues are to be included | Space: object requires documentation | |
67 | 252 | Indicates that workitems are to be created when errors occur | Space: object requires documentation | |
68 | 253 | Indicates that net change planning is to be used | Space: object requires documentation | |
69 | 280 | Select a row | Space: object requires documentation | |
70 | 281 | Position cursor on a line with active replenishment management | Space: object requires documentation | |
71 | 282 | Position cursor on a line with materials inventory management | Space: object requires documentation | |
72 | 283 | Position cursor on line with non-initial no. for last replenishment run | Space: object requires documentation | |
73 | 301 | Please enter customer | Space: object requires documentation | |
74 | 302 | The reorder point must be less than the target stock | Space: object requires documentation | |
75 | 303 | The minimum target stock must not be greater than the max. target stock | Space: object requires documentation | |
76 | 304 | The target stock must be between the minimum and maximum target stock | Space: object requires documentation | |
77 | 305 | The minimum target stock is not maintained | Space: object requires documentation | |
78 | 306 | Target stock should be zero | Space: object requires documentation | |
79 | 307 | The target stock must be greater than zero if the GI indicator is not set | Space: object requires documentation | |
80 | 308 | Min. and max. target stock and reorder point are not used | Space: object requires documentation | |
81 | 309 | The maximum target stock is not maintained | Space: object requires documentation | |
82 | 310 | The "Use replenishment-based IM" indicator will be set | Space: object requires documentation | |
83 | 311 | The "Only include goods issues" indicator is not set | Space: object requires documentation | |
84 | 312 | Replenishment control for struct. material &1 in store &2 contains errors | Space: object requires documentation | |
85 | 313 | Function only suitable for customers to whom no plant has been assigned | Space: object requires documentation | |
86 | 314 | Target stock calculated dynamically: target range of coverage must be > 0 | Space: object requires documentation | |
87 | 315 | Subsequent message is valid for material &1 customer &2 | Space: object requires documentation | |
88 | 316 | The reorder point must be greater thatn the safety stock | Space: object requires documentation | |
89 | 317 | Article &1 is Generic Article or Variant, Therefore not Changed | The short text describes the object sufficiently | |
90 | 350 | No changes were found for change object WRPL | Space: object requires documentation | |
91 | 351 | No interested partner system could be found | Space: object requires documentation | |
92 | 401 | Selection variant name already exists. Choose new name | Space: object requires documentation | |
93 | 402 | An info structure with this name does not exist | Space: object requires documentation | |
94 | 403 | The selected key figure does not exist in the selected info structure | Space: object requires documentation | |
95 | 410 | Please maintain a period | Space: object requires documentation | |
96 | 411 | Selection variant does not exist | Space: object requires documentation | |
97 | 501 | Number for replenishment run could not be issued | ||
98 | 502 | Job parameters could not be determined | Space: object requires documentation | |
99 | 503 | Not all follow-on documents could be saved to database | ||
100 | 504 | Not all error messages could be saved to database | ||
101 | 505 | Replenishment monitor: no data selected | Space: object requires documentation | |
102 | 506 | No replenishment runs selected | Space: object requires documentation | |
103 | 507 | Data from &1 replenishment runs deleted | Space: object requires documentation | |
104 | 511 | No further entries exist | Space: object requires documentation | |
105 | 512 | Hide area: &1 | Space: object requires documentation | |
106 | 520 | Position cursor on a line that is not empty | Space: object requires documentation | |
107 | 600 | Data for customer &1 successfully posted from IDoc | ||
108 | 601 | EDI partner &1 and vendor descr. &2: no distribution chain found | ||
109 | 602 | Customer &1 and distr. chain &2 &3 &4: no recipient could be determined | ||
110 | 603 | Customer &1 and sales area &2 &3 &4: GR could not be uniquely determined | ||
111 | 604 | Material ID &1 , qualifier &2: no material found | ||
112 | 605 | Wrong unit of measure for material &1: OUn is &2 - &3 was transferred | ||
113 | 606 | Info structure S130 does not exist or has no period | ||
114 | 607 | Length of period specified in segment is 0 | ||
115 | 608 | Info structure S130 update for material &1 customer &2 failed | ||
116 | 609 | No unique distribution chain found for goods recipient &1 | ||
117 | 620 | Purch. org. data for vendor &1, customer &2 could not be determined | ||
118 | 621 | Purch. org. data for vendor &1, customer &2 not unique | ||
119 | 628 | Purchase order &2 created for vendor &1. | ||
120 | 700 | *-------------------------- Store Replenishment ------------------------* | Space: object requires documentation | |
121 | 701 | No recipients selected for store replenishment | Space: object requires documentation | |
122 | 702 | Parallel processing possible in background processing only | Space: object requires documentation | |
123 | 703 | Incorrect control parameter for selection | Space: object requires documentation | |
124 | 704 | Functionality not yet available | Space: object requires documentation | |
125 | 705 | Enter a valid planning date | Space: object requires documentation | |
126 | 706 | Receipts/issues using ATP only when determining stock situation | Space: object requires documentation | |
127 | 707 | Supply source determination only possible when redefining all master data | Space: object requires documentation | |
128 | 708 | Redefinition of rounding params only possible for supply source determin | Space: object requires documentation | |
129 | 709 | Only enter number of recipients per process in parallel processing | Space: object requires documentation | |
130 | 710 | Parallel processing requires the number of recipients per process | Space: object requires documentation | |
131 | 711 | Matl grp restriction only poss. w. redeterm. of general matl master data | Space: object requires documentation | |
132 | 712 | Error when calculating the goods receipt after next | Space: object requires documentation | |
133 | 713 | Receipts/issues using ATP only possible for redetermin of logistics data | Space: object requires documentation | |
134 | 714 | No MRP type was entered for replenishment | Space: object requires documentation | |
135 | 715 | Recipient processing (customer number &1, plant &2) in &3 for: | Space: object requires documentation | |
136 | 716 | &1 items, &2 WRPL changes, &3 WRPT changes, &4 error items | Space: object requires documentation | |
137 | 717 | General Retail Customizing could not be defined | Space: object requires documentation | |
138 | 718 | Determination of issues/receipts only possible if they are included | Space: object requires documentation | |
139 | 719 | Reorder point for article & has not been reached | Space: object requires documentation | |
140 | 720 | Master data determination of all replenishment-relevant articles | Space: object requires documentation | |
141 | 721 | Check reorder point for the material using reorder point planning | Space: object requires documentation | |
142 | 722 | Execute requirements calculation for the &th package | Space: object requires documentation | |
143 | 723 | Calculation of next goods receipt and delivery date | Space: object requires documentation | |
144 | 724 | Calculation of forecast issues and receipts | Space: object requires documentation | |
145 | 725 | An error occurred when processing material & for recipient & | Space: object requires documentation | |
146 | 726 | Forecast issues/receipts could not be calculated for article & | Space: object requires documentation | |
147 | 727 | Calculation of replenishment requirements | Space: object requires documentation | |
148 | 728 | Calculation of next planning period for time-phased planning requirements | Space: object requires documentation | |
149 | 729 | Could not define next planning time period for material & | Space: object requires documentation | |
150 | 730 | Rounding of replenishment requirements to logistic units of measure | Space: object requires documentation | |
151 | 731 | Execution of document generation for the &th package | Space: object requires documentation | |
152 | 732 | Requirements cannot be planned for combination &1/&2 in replenishement | Space: object requires documentation | |
153 | 733 | For material &, the system defined a (gross) requirement of & & | Space: object requires documentation | |
154 | 734 | Category & follow-on document was generated with the number & | Space: object requires documentation | |
155 | 735 | Report incorrectly scheduled for store replenishment | Space: object requires documentation | |
156 | 736 | Incorrect requirement calculation data for material & for recipient & | Space: object requires documentation | |
157 | 737 | Create packages using an ID given by a follow-on function | Space: object requires documentation | |
158 | 738 | Net-change flag not set for material & | Space: object requires documentation | |
159 | 739 | For material &, the system determined a (net) requirement of & & | Space: object requires documentation | |
160 | 740 | Material & for recipient & contains errors | Space: object requires documentation | |
161 | 741 | Requirement calculation for recipient: | Space: object requires documentation | |
162 | 742 | Recipient & is locked | Space: object requires documentation | |
163 | 743 | Materials to be processed for recipient & are locked | Space: object requires documentation | |
164 | 744 | Follow-on document generation for recipient: | Space: object requires documentation | |
165 | 745 | Could not lock recipient & | Space: object requires documentation | |
166 | 746 | For material &, the system determined a dynamic target stock of & & | Space: object requires documentation | |
167 | 747 | For material &, the system determined & as the next planning time | Space: object requires documentation | |
168 | 748 | Not all components of material & can be processed further | Space: object requires documentation | |
169 | 800 | *---------------------------- XPRA ----------------------------------* | Space: object requires documentation | |
170 | 801 | Online processing not allowed | Space: object requires documentation | |
171 | 802 | Application: Replenishment (Retail), Client: &1 | Space: object requires documentation | |
172 | 803 | Error transferring data to table WRPT | Space: object requires documentation | |
173 | 804 | &2: &1 entries successfully transferred | Space: object requires documentation | |
174 | 805 | The current release level &1 is lower than the required release level &2 | ||
175 | 806 | The current release &1 is before target release &2 | ||
176 | 807 | No data to be converted | Space: object requires documentation | |
177 | 808 | The current Release &1 not in valid range (&2-&3) | Space: object requires documentation | |
178 | 809 | Wrong Retail release (at least 1.2B required) | Space: object requires documentation | |
179 | 810 | Client &1: period split ' ' or. 'posting per'. Target range/cov. set to 0 | Space: object requires documentation | |
180 | 811 | S130: period split missing for client &1. Target range/coverage set to 0 | Space: object requires documentation | |
181 | 812 | You are not authorized to make the conversion | Space: object requires documentation | |
182 | 813 | Recipient &1, material &2: fields to be converted already maintained | Space: object requires documentation | |
183 | 900 | The current release level &1 is lower than the required release level &2 |
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |