SAP ABAP Message Class P5 (Project Information System: (Modification of LIS; M5))
Basic Data
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-IS (Application Component) Information System
⤷
CNIS (Package) Application development R/3 PS information system
⤷
⤷
Attributes
| Message class | P5 | |
| Short Description | Project Information System: (Modification of LIS; M5) | |
| Changed On | 20130531 | |
| Last Changed At | 101244 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | To confirm the transfer, press ENTER | |||
| 2 | Predefined breakdown path not possible | |||
| 3 | End of standard breakdown reached | |||
| 4 | Breakdown & already performed | |||
| 5 | Version & deleted | |||
| 6 | Breakdown only possible on object value | |||
| 7 | Version & saved | |||
| 8 | Project profile & does not exist | |||
| 9 | Network profile & does not exist | |||
| 10 | Position cursor on field column | |||
| 11 | No history is recorded | |||
| 12 | Enter column width between & and & | |||
| 13 | Field &-& not defined. | |||
| 14 | Project planning board & does not exist | |||
| 15 | Project profile not entered | |||
| 16 | Less that 2 numerical fields selected | |||
| 17 | More than 200 objects selected | |||
| 18 | Please position cursor on numeric column | |||
| 19 | No data exists matching your selection. | |||
| 20 | No saved data available | |||
| 21 | No breakdown performed | |||
| 22 | Planned independent requirements not included in MRP | |||
| 23 | Different currencies - choose analysis currency | |||
| 24 | Units are different - function will be performed without unit reference | |||
| 25 | Impossible to convert currency &2 to &1 for exchange rate type &3 for &4 | Space: object requires documentation | ||
| 26 | Units are different - graphic will be displayed without unit reference | |||
| 27 | Place cursor on characteristic value | |||
| 28 | Object for display in graphic not selected | |||
| 29 | No dates exist | |||
| 30 | There is no status management for this object type | |||
| 31 | Function not allowed as not all materials were copied | |||
| 32 | Forecast has changed since the last transfer | |||
| 33 | Column width adjusted to output length | Space: object requires documentation | ||
| 34 | The production plan has changed for the PG | |||
| 35 | Scrolling not possible: last column already reached | Space: object requires documentation | ||
| 36 | Scrolling not possible: first column already reached | Space: object requires documentation | ||
| 37 | Data from version & being read | Space: object requires documentation | ||
| 38 | The production plan has changed | |||
| 39 | You are not authorized to display version & | Space: object requires documentation | ||
| 40 | Several references have changed -> error log | |||
| 41 | XXL function & not possible | |||
| 42 | Data transferred to EXCEL | |||
| 43 | Possible entries cannot be displayed here | |||
| 44 | XXL function not possible | |||
| 45 | Period & already exists with another period indicator | |||
| 46 | XXL function not possible | |||
| 47 | XXL file could not be opened | |||
| 48 | XXL file could not be produced | |||
| 49 | EXCEL list viewer is not correctly installed | |||
| 50 | The data quantity to be transferred is too large | |||
| 51 | Error when reading table "&" from the dictionary | |||
| 52 | No field comparison possible for & | |||
| 53 | No period split exists | |||
| 54 | Function "all fields" only possible on the object line | |||
| 55 | Error >&< occurred when sending overview | |||
| 56 | Unit conversion not possible | |||
| 57 | You canceled activity & | |||
| 58 | PG for material & plant & not found | |||
| 59 | Error no. >&< occurred when converting overview list | |||
| 60 | Posting period does not exist | |||
| 61 | Error no. & occurred when calling analysis from SAPOffice in program & | |||
| 62 | Parameter for funct. analysis call from SAPOffice cannot be determined | |||
| 63 | Choose fewer fields or a narrower column width | Space: object requires documentation | ||
| 64 | Requirement existed in deleted state, and was chenged | |||
| 65 | & plant & is a product group, not a material - enter a material | |||
| 66 | You do not have authorization to create selection version & | Space: object requires documentation | ||
| 67 | Entry cannot be interpreted as number | |||
| 68 | Too many places after decimal point | |||
| 69 | Characteristic must be selected due to characteristic chain: & & & & | Space: object requires documentation | ||
| 70 | Period & already exists as period split | |||
| 71 | There are no fields available for selection | Space: object requires documentation | ||
| 72 | MRP controller & does not exist for plant & | |||
| 73 | Please enter either a material number or an MRP controller | |||
| 74 | You do not have authorization to create selection versions | Space: object requires documentation | ||
| 75 | No further materials selected | |||
| 76 | Spool order created | |||
| 77 | No deviations exist | |||
| 78 | Selected function cannot be used for the element | |||
| 79 | No sales plan available for the members of PG & | |||
| 80 | Select one histogram | |||
| 81 | Select only one histogram | |||
| 82 | Select one comparison object | |||
| 83 | Select only one comparison object | |||
| 84 | No production plan for the members of PG & | |||
| 85 | Material & & is not provided for demand management | |||
| 86 | No simulative dependent requirements exist for material & & | |||
| 87 | The total of the parameters must be 100 | |||
| 88 | Only six columns could be displayed | Space: object requires documentation | ||
| 89 | Only the first ten columns can be displayed | The short text describes the object sufficiently | ||
| 90 | Enter WBS element, as there are a number of subprojects. | |||
| 91 | Units are different | Space: object requires documentation | ||
| 92 | Not all units could be converted | Space: object requires documentation | ||
| 93 | Project & : Plan values reconstructed | |||
| 94 | Project & : Locked at present - reconstruction not possible | |||
| 95 | Project & : System error during locking | |||
| 96 | Project & ; No WBS elements capable of processing | |||
| 97 | Project & : Profile does not exist or has not been maintained | |||
| 98 | Project & : Number range not defined for line items | |||
| 99 | Project & : No authorization | |||
| 100 | Project & : Error has occurred, no change to plan data | |||
| 101 | No budget object found for WBS element & | |||
| 102 | Error & in time difference calculation | |||
| 103 | No budget object found for WBS element & |
History
| Last changed on/by | 20130531 | SAP | |
| SAP Release Created in |