SAP ABAP Message Class 88 Message Number 839 (Period grid for infostructure &1 is not defined)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   IS-REA-COR (Application Component) Recycling Administration Core Functions
     J7LR (Package) REA Core Functionality
Attribute
Message class 88  
Short Description REA Processing    
Message Number 839  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20110908   
Message Text
Period grid for infostructure &1 is not defined
Help Document

Diagnosis

No period grid has been defined for info structure &1.

System Response

The system can not continue processing.

Procedure

For an internal info structure please check the settings for update control in Customizing for the logistics information system. In the case of a pseudo information structure for external billing data, you have to specifiy the period grid in general REA Customizing under "Control of Declaration/Origin Movement Data".

History
Last changed on/by 20110908  SAP 
SAP Release Created in