SAP ABAP Message Class 6R Message Number 009 (Can the delivery date be upheld? Proposal: &)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WDISPO (Package) Retail Functions for Requirements Planning
⤷ MM-CBP-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WDISPO (Package) Retail Functions for Requirements Planning
Attribute
Message class | 6R | ||
Short Description | Messages for Retail MRP | ||
Message Number | 009 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Can the delivery date be upheld? Proposal: &
Help Document
Diagnosis
The system calculates the earliest possible delivery date on the basis of the factory calendar, planned delivery time, etc.
The delivery date entered is before the earliest possible delivery date calculated by the system.
Procedure
Change the delivery date as required.
History
Last changed on/by | 19991117 | SAP | |
SAP Release Created in |