SAP ABAP Message Class 6P Message Number 513 (Requirement existed in deleted state, and was chenged)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-MP-DEM (Application Component) Demand Management
     MDPB (Package) Application development R/3 purchasing
Attribute
Message class 6P  
Short Description Messages for planned independent requirements (Appl.area 60)    
Message Number 513  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Requirement existed in deleted state, and was chenged
Help Document

Diagnosis

System Response

The system saves all planned independent requirements that are entered under a requirements number that is maintained internally within the system. This requirements number is not deleted if you delete the planned independent requirement. That is, if a planned independent requirement item of a particular material is deleted, this requirements number still remains in the system. New planned independent requirements or changed independent requirements that are entered for this material are continued to be saved under this number.

History
Last changed on/by 20100310  SAP 
SAP Release Created in