SAP ABAP Message Class 6P Message Number 142 (The period of examination contains more than 100 schedule line dates)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-MP-DEM (Application Component) Demand Management
     MDPB (Package) Application development R/3 purchasing
Attribute
Message class 6P  
Short Description Messages for planned independent requirements (Appl.area 60)    
Message Number 142  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20100310   
Message Text
The period of examination contains more than 100 schedule line dates
Help Document

Diagnosis

At least 50 various schedule lines can be transferred via the EXCEL interface. The planned independent requirement of the entered material contains more than 50 schedule lines.

Procedure

Limit the period of examination so that it contains less than 50 schedule lines.Diagnosis

History
Last changed on/by 20100310  SAP 
SAP Release Created in