SAP ABAP Message Class 6P Message Number 141 (Schedule lines in the past were ignored)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-MP-DEM (Application Component) Demand Management
     MDPB (Package) Application development R/3 purchasing
Attribute
Message class 6P  
Short Description Messages for planned independent requirements (Appl.area 60)    
Message Number 141  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Schedule lines in the past were ignored
Help Document

Diagnosis

At least 50 various schedule lines can be transferred via the EXCEL interface. The planned independent requirement of the entered material contains more than 50 schedule lines.

System Response

If schedule lines exist in the past, they are ignored by the system. If less than 50 schedule lines exist once the ones in the past have been subtracted, the system accesses the EXCEL interface and displays the schedule lines from the current date.

Procedure

Limit the period of examination so that it contains less than 50 schedule lines.

History
Last changed on/by 20100310  SAP 
SAP Release Created in