Hierarchy
⤷ PP-MP-DEM (Application Component) Demand Management
⤷ MDPB (Package) Application development R/3 purchasing
Attribute
Message class | 6P | ||
Short Description | Messages for planned independent requirements (Appl.area 60) | ||
Message Number | 031 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Help Document
Diagnosis
No valid requirements type could be determined.
This may be due to one of the following reasons:
- No strategy group has been maintained in the material master record.
- In the material master record, you have maintained an MRP group, however, no strategy group has been allocated to this MRP group.
System Response
If you entered a strategy group or an MRP group in the material master record for which a strategy group exists in Customizing, then the system determines the requirements type from the strategy group in Customizing and proposes the main strategy.
Note
The strategies or requirements types allowed for planning a material are grouped together in Customizing for demand management in the strategy group. This strategy group is allocated to the material in the material master record, either directly or via the MRP group.
Procedure
Check the possible causes of the error and maintain the correspnding function:
Check whether an MRP group or a strategy group us entered in the material master record.
Proceed
Check in Customizing whether a strategy group has been allocated to the MRP group.
Proceed
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |