SAP ABAP Message Class 6P Message Number 031 (Strategy group has not been maintained)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-MP-DEM (Application Component) Demand Management
     MDPB (Package) Application development R/3 purchasing
Attribute
Message class 6P  
Short Description Messages for planned independent requirements (Appl.area 60)    
Message Number 031  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Strategy group has not been maintained
Help Document

Diagnosis

No valid requirements type could be determined.

This may be due to one of the following reasons:

  1. No strategy group has been maintained in the material master record.
  2. In the material master record, you have maintained an MRP group, however, no strategy group has been allocated to this MRP group.

System Response

If you entered a strategy group or an MRP group in the material master record for which a strategy group exists in Customizing, then the system determines the requirements type from the strategy group in Customizing and proposes the main strategy.

Note

The strategies or requirements types allowed for planning a material are grouped together in Customizing for demand management in the strategy group. This strategy group is allocated to the material in the material master record, either directly or via the MRP group.

Procedure

Check the possible causes of the error and maintain the correspnding function:

Check whether an MRP group or a strategy group us entered in the material master record.

Proceed

Check in Customizing whether a strategy group has been allocated to the MRP group.

Proceed

History
Last changed on/by 20100310  SAP 